Loadline

The wedge: prove what left the gate.

Loadline Dispatch

Load plan to weighbridge to delivery, with the variance verdict that turns shrinkage from a suspicion into a number your CFO can act on.

← All modules
  • Weighbridge-integrated gate-in / weigh-in / load / weigh-out / gate-out
  • Per-product variance tolerance with an absolute floor
  • Flagged trips need a supervisor override, audited forever
  • The shrinkage report: gate-out vs geofence-confirmed delivery